More realistically, an investment planner will have to choose between many different plant sizes or firm scales of operation, and so the long run average cost curve will be smooth, something like this:
As shown, each point on the LRAC corresponds to a point on the SRAC for the plant size or scale of operation that gives the lowest average cost for that scale of operation.